fbpx
Connect with us

Mississippi News

Jackson water plant still ‘a couple years’ from winter protection

Published

on

Jackson water plant still ‘a couple years' from winter protection

Nearly one year ago, thousands of residents in Mississippi's capital city without for weeks when a winter storm shut down the city of Jackson's main water treatment plant.

Today, the city's head engineer says the plant is still another couple years away from the protection it needs against a repeat winter weather .

The city is also working to fix a new set of outages in south Jackson, which began last week after an equipment failure at the treatment plant as well as breaks in some of the water lines. City Engineer Charles Williams said that the issue was not weather related, and updated on Monday that it'll take at least a couple days to rebuild pressure in the system.

Advertisement

Williams — who recently stepped aside as Public Works Director, but still oversees the water system — explained that while the city has improved the efficiency at the O.B. Curtis water treatment plant over the last year, the facility remains vulnerable to freezing weather. 

“I'm not really sure how we would respond again to that right now,” Williams told .

He said that because Jackson, like many Southern cities, never anticipated the kind of unrelenting freeze that struck last year, it will take a while to adjust.

“What we've been to articulate is this is not something that's going to be done overnight,” he said. “It's going to take probably a couple years for us to get to where we need to be.

Advertisement

“The likelihood of another winter storm coming, we don't know. Obviously there have been some changes in the climate. It looks like the South is going to be a lot more affected with the polar vortexes that are coming down, bringing colder temperatures and potential for snow and ice.”

Williams specified that the long-term goal is to build enclosures around O.B. Curtis, especially on the side that intakes untreated water from the Ross Barnett Reservoir. A majority of the equipment at the plant is outdoors and exposed, which is why the cold had such devastating effects a year ago. 

READ MORE: Why Jackson's water system is broken

He said he expects one new enclosure around the membrane side of the plant to be finished by April. The city recently secured $27 million through the federal Drinking Water State Revolving Loan Fund, which it's spending on the enclosure as well as upgraded heat tracing at the plant to help warm the equipment and prevent freezing.  

Advertisement

O.B. Curtis, Jackson's primary treatment plant, is itself split into two filtering systems: the conventional and membrane sides, which each can treat 25 million of water per day. 

Williams said that after repairs the last few months, both sides of the plant are in better shape than when last year's storm hit. 

The conventional side, which uses ultraviolet light to kill bacteria, was only running at about two-thirds capacity before the freeze. Williams said that a couple U.V. reactors still need repairs, which he hopes will take just another 30 to 45 days, but that the conventional side is running at its needed capacity. 

On , only three of the six membrane trains were running when the storm hit. Williams said that five of the six are now working, and that he expects to have the last one fixed by February. 

Advertisement

He clarified that the train that went offline last week — which in part caused the current outages — didn't break, but failed a test from the department, forcing plant personnel to turn the train off.

As far as upgrades, the city is also looking at its aging distribution system: $8 million of the $42 million the city received through the American Rescue Plan Act is set to go towards a new 48-inch water main near Jefferson St. that will reach down to Interstate 20. Williams said the new line will bring better water pressure to south Jackson, and expects it to be in place by this time next year. 

Jackson City Council also recently approved a 20% increase on water and sewer bill rates in addition to a $9,000 salary increase for treatment plant operators; both moves should help recruit and retain plant personnel, Williams said, and the added bill revenue will go towards routine maintenance.

He said the plant lost some staff over the last year, and described the situation as being “barebones” during the fall, although the department did recently hire a new operator and instrument technician. Operators are still the priority because federal requires one of them to be at the plant 24/7, and Williams said he hopes to hire two more within the next month or so. 

Advertisement

READ MORE: Federal infrastructure bill won't address Jackson water crisis without help of state leaders

This article first appeared on Mississippi Today and is republished here under a Creative Commons license.

Mississippi News

Retrial for Beth Ann White begins Monday

Published

on

www.wjtv.com – Kaitlin Howell – 2024-04-28 17:49:54

SUMMARY: In , Mississippi, Beth Ann White is facing her second trial for a crash that killed a mother and her six-month-old son in November 2021. During the first trial, it was alleged that White had a blood alcohol content level more than three times the legal limit. The defense questioned the right of way during the crash, resulting in a mistrial due to the jury's inability to reach a consensus on a verdict. White was indicted on four counts of aggravated DUI and has pled not guilty. After the trial ended with a hung jury, the county re-indicted White for the charges.

Read the full article

The post Retrial for Beth Ann White begins Monday appeared first on www.wjtv.com

Advertisement
Continue Reading

Mississippi News

Mississippi lawmakers send education, PERS bills to governor

Published

on

www.wjtv.com – Richard Lake – 2024-04-28 17:18:04

SUMMARY: Mississippi lawmakers settled contentious issues, sending a new public education formula to Governor Tate Reeves. The Mississippi Student Funding Formula would replace MAEP, bringing in $220 million more to . The compromise was well-received by lawmakers and educators, providing a more understandable and predictable funding mechanism. Additionally, a deal was reached on the Public Employees' Retirement System, which mandates an increase in contributions but will not impact current . House Speaker Jason White emphasized the importance of prioritizing education funding, PERS, and access in Mississippi, expressing hope for further compromises in the future.

Read the full article

The post Mississippi lawmakers send education, PERS bills to governor appeared first on www.wjtv.com

Advertisement
Continue Reading

Mississippi News

Hunter Hines leads MSU baseball to series win at Vanderbilt

Published

on

www.wcbi.com – Grace Ybarra – 2024-04-28 16:36:08

SUMMARY: Mississippi defeated Vanderbilt 8-7 in three to clinch the . Despite Vanderbilt tying the game with six runs in the sixth inning and taking the in the seventh, Mississippi State rallied in the ninth with a two- homer by Hunter Hines. Tyson Hardin closed out the game with a scoreless ninth inning. The win improved Mississippi State's SEC record to 12-9.

Read the full article

The post Hunter Hines leads MSU baseball to series win at Vanderbilt appeared first on www.wcbi.com

Advertisement
Continue Reading

News from the South

Trending